Terror Lake Third Turbine Installation Update – September, 2013

This gallery contains 5 photos.

The Third Unit Installation at KEA’s Terror Lake Hydroelectric Plant continues to progress well.  The generator portion of the turbine-generator machinery is nearly complete, and KEA is very excited to see the powerhouse evolve as final pieces are put into … Continue reading

Gallery

Terror Lake Prize Trip – “Awesome!”

At KEA’s 2013 Annual Membership Meeting on April 22, 2013, prize drawings included two round-trips for two to the Terror Lake Hydroelectric Project on September 11, 2013.  The lucky winners were Antonio and Ladonna Gil, and Kip and Leigh Thomet.  Antonio, Ladonna, and Kip … Continue reading

Posted in Annual Membership Meeting, Terror Lake Hydroelectric Facility, Uncategorized