Category Archives: Terror Lake Hydroelectric Facility

KEA’s 73rd Annual Membership Meeting – Informative and Fun!

Thank you to everyone who attended our 73rd Annual Membership Meeting on April 20, 2015 in the Kodiak Harbor Convention Center!  Two hundred and thirty-seven (237) members were registered when registration concluded.  Every registered member received a $25 electric energy credit applied … Continue reading

Posted in Annual Membership Meeting, Board of Directors, Employees, KEA Headquarters Building, Renewable Energy, Report from the President/CEO, Safety Articles, Scholarships, Terror Lake Hydroelectric Facility, Uncategorized

KEA Featured in Alaska Airlines’ Alaska Beyond Magazine

If you have the good fortune to travel on Alaska Airlines this month, make sure to check out the April 2015 edition of Alaska Beyond Magazine!  It includes a great article, “The Triumph of Clean Energy, Wind and Solar power … Continue reading

Posted in Pillar Mountain Wind Farm, Renewable Energy, Terror Lake Hydroelectric Facility, Uncategorized

Happy New Year!

The Board of Directors and employees of Kodiak Electric Association wish you a Happy New Year!  As we close out 2014 and move into 2015, it’s a tremendous honor to announce that your electric cooperative generated 99.7% of our power … Continue reading

Posted in Board of Directors, Employees, Pillar Mountain Wind Farm, Terror Lake Hydroelectric Facility, Uncategorized

Alaska Energy Authority and Kodiak Electric Association Receive National Renewable Energy Award

Alaska Recognized for State Leadership in Clean Energy Alaska Energy Authority and Kodiak Electric Association Receive National Renewable Energy Award   Sara Fisher-Goad, executive director of the AEA –   Steve Lindenberg, Senior Advisor for Renewable Power at the US Dept. … Continue reading

Posted in Pillar Mountain Wind Farm, Terror Lake Hydroelectric Facility

2013 Annual Report – Our Plan Comes Together…

After many years of hard work and innovation, KEA has set the stage for over 99% of our power generation to come from renewable energy sources. The Voting Packet mailed to all KEA members on March 27 included highlights from … Continue reading

Posted in Annual Membership Meeting, Board of Directors, Capital Credits, Employees, Pillar Mountain Wind Farm, Report from the President/CEO, Terror Lake Hydroelectric Facility, Uncategorized

Terror Lake Third Turbine Installation Update – September, 2013

This gallery contains 5 photos.

The Third Unit Installation at KEA’s Terror Lake Hydroelectric Plant continues to progress well.  The generator portion of the turbine-generator machinery is nearly complete, and KEA is very excited to see the powerhouse evolve as final pieces are put into … Continue reading

Gallery

Terror Lake Prize Trip – “Awesome!”

At KEA’s 2013 Annual Membership Meeting on April 22, 2013, prize drawings included two round-trips for two to the Terror Lake Hydroelectric Project on September 11, 2013.  The lucky winners were Antonio and Ladonna Gil, and Kip and Leigh Thomet.  Antonio, Ladonna, and Kip … Continue reading

Posted in Annual Membership Meeting, Terror Lake Hydroelectric Facility, Uncategorized